在地垫上面安装地板,在地板收边时用地板垫块来固定预留收缩缝,垫块有2/2.5/3cm 3个规格,根据当地安装习惯选择地板垫块的大小。地板与地板之间需要安装紧实,可用敲板顶着地板企口,然后用锤子敲打。垫块和敲板都可在安装测量工具箱里面找到。
Install the floor on the mat, and fix the reserved shrinkage joint with the floor pad when the floor is closed. The pad has 3 specifications of 2/2.5/3cm. Choose the size of the floor pad according to the local installation habits. The floor and floor need to be installed tightly, which can be knocked on the floor and then hammered. Both the pad and the knocking board can be found in the installation measuring toolbox.
安装过程中,为了保证地板的平整度和规整,可以使用安装测量工具箱里面的红外线水平仪。水平仪可输出90度的两条线,也可以根据单线对齐地板。使用之前请先根据双汽泡水准器调整好水平仪本身的平整度。
During the installation process, in order to ensure the smoothness and regularity of the floor, you can use the infrared level instrument installed in the measuring toolbox. The horizontal instrument can output 90 degrees of two lines, and also can align the floor according to the single line. Before use, adjust the flatness of the horizontal instrument according to the double steam bubble preventer.
地板铺到更后收尾的时候,边角会有部分空间无法放入整块地板,这个时候就需要对地板进行切割,地板切开的地方可使用水性多功能封闭剂进行防水保护处理,用刷子蘸封闭剂均匀涂刷在切割部位,3-5分钟即可表干安装,干燥后无色,不影响地板表面颜色。
When the floor is laid to the end, there will be part of the corner space can not be put into the whole floor, this time the need to cut the floor, the floor can be cut where the use of water-based multi-functional sealant waterproof protection treatment, with a brush dipped in sealant evenly brushed in the cutting site, 3-5 minutes to watch dry installation, dry. After drying, it is colorless and does not affect the surface color of the floor.
地板安装完毕后,在墙边收缩缝里面安装地板弹簧片,地板纵向约每40cm安装一个弹簧片,横向两个地板拼缝之间安装一个弹簧片,安装完毕后,取出垫块,安装过程完毕。
After the floor is installed, the floor spring sheet is installed in the wall contraction joint. The floor is longitudinally installed with a spring sheet every 40 cm. A spring sheet is installed between the horizontal two floor joint. After the installation, the pad is removed and the installation process is completed.